Engineering Project Dossiers

Verified execution records covering turnkey structural fabrication, mud tank piping engineering, and certified onsite rig modifications for premier drilling contractors in Saudi Arabia and the GCC.

0 Skip Tanks Delivered
0 Payload per Unit
100% NDT & Hydrotested
AISC Weld Qualified
4 Dossiers Active
DOSSIER 01 / 04 FABRICATION SCOPE

50 Heavy Skip Tanks • 11-Ton Capacity

Turnkey fabrication of fifty (50) heavy skip tanks with 11-ton capacity engineered to Halliburton specification BAR-SS-10096.

Client Halliburton
Project Type Heavy Skip Tanks
Total Volume 50 Fabricated Units
Payload Capacity 11-Ton (11,000 KG) per Unit
Specification BAR-SS-10096
Source Reference Company Profile Page 26 Verified
• Verified Profile Record Inquire Similar Scope
Halliburton Fabricated Skip Tanks 11 Ton Capacity 50 Units
HALLIBURTON • BAR-SS-10096
DOSSIER 02 / 04 SKID FABRICATION

Mud Material Storage Skids • 8 Units

Structural fabrication of eight (8) high-capacity mud chemical and pallet storage skids for Helmerich & Payne.

Client Helmerich & Payne (H&P)
Project Type Rig Skid Fabrication
Quantity 8 Storage Skids
Application Mud Chemical & Material Storage
Source Reference Company Profile Page 25 Verified
• Verified Profile Record Inquire Similar Scope
Helmerich and Payne Mud Material Storage Skid 8 Nos
HELMERICH & PAYNE • 8 NOS
DOSSIER 03 / 04 RIG MODIFICATION

Modification of Pipeline in Mud Tanks

Modification and integration of pipeline piping inside rig mud circulation tanks for Helmerich & Payne.

Client Helmerich & Payne (H&P)
Rig Component Mud Tanks Pipeline Modification
Source Reference Company Profile Page 26 Verified
• Verified Profile Record Inquire Similar Scope
Helmerich and Payne Modification of Pipeline in Mud Tanks
HELMERICH & PAYNE • MUD TANKS
DOSSIER 04 / 04 FIELD SERVICES

Onsite Modification of Pipeline

Onsite modification of pipeline executed for Helmerich & Payne on active rig locations.

Client Helmerich & Payne (H&P)
Scope Onsite Modification of Pipeline
Operating Context Active Rig Sites
Source Reference Company Profile Page 25 Verified
• Verified Profile Record Inquire Similar Scope
Helmerich and Payne Onsite Modification of Pipeline
HELMERICH & PAYNE • ONSITE
PROJECT DOSSIERS FAQ • VERIFIED EXECUTION

Frequently Asked Technical Questions About ENSERV Projects

Documented client scopes, engineering specifications, and field delivery track record.

What major oilfield fabrication projects has ENSERV completed?

ENSERV's verified track record features critical fabrication and modification contracts: (1) Fifty (50) 11-ton heavy skip tanks engineered to Halliburton specification BAR-SS-10096; (2) Eight (8) heavy mud material and pallet storage skids for Helmerich & Payne (H&P); (3) Turnkey pipeline modifications inside rig mud circulation tanks; and (4) Onsite active rig pipeline modifications.

What specification was followed for the Halliburton skip tanks?

The 50 heavy skip tanks were fabricated strictly to Halliburton engineering specification BAR-SS-10096. Each unit has an 11-ton (11,000 kg) payload capacity, engineered with heavy structural steel, lifting pad-eyes, and complete weld NDT records certified for offshore/onshore rig handling.

What rig modification work does ENSERV perform for Helmerich & Payne?

ENSERV provides specialized fabrication and field engineering to H&P drilling operations, including structural mud chemical storage skids (8 units), internal mud tank circulation piping reconfigurations, and emergency high-pressure line modifications executed directly on active rig locations.

How can clients inquire about contracting similar custom fabrication?

Technical project teams can transmit structural drawings, specifications, and delivery timelines directly to our Al-Jubail engineering desk at enservs.com/contact.html or email sales@enservs.com for feasibility and commercial review.

04 / RFQ CONVERSION • COMMERCIAL TENDER DESK

Ready to Discuss Your Next Project Requirement?

From turnkey mud cutting tanks and skid packaging to emergency onsite pipeline modifications, our engineering team in Al-Jubail is ready to evaluate your specifications.